Figura professionale: qc enginee/inspector/expedier, tester
Nome Cognome | : g. l. | Età | : 46 |
---|---|---|---|
Cellulare/Telefono | : Riservato! | : Riservato! | |
CV Allegato | : Riservato! | Categoria CV | : Help Desk-Tester |
Sede preferita | : italia / estero |
Accesso Full al database con 29.998 CV a partire da € 5,00 ABBONATI SUBITO!
Sommario
Esperienze
November 2018 to present
QC Coordinator on behalf of Saipem SPA at
1) KPIOS (Kuwait Petroleum Industrial Oil Service) in Kuwait for KOC FEED PIPELINES FOR NEW
REFINERY PROJECT (API 5L Gr.X-52MS PSL-2 Sour Service Pipe – then externally coated with
3LPE & DFBE)
2) Khalil Bahman & Partners in Kuwait for KOC FEED PIPELINES FOR NEW REFINERY PROJECT
(CS PRESSURE VESSEL & PIG LAUNCHERS/RECEIVERS)
3) Heisco (Heavy Engineering Industries & Shipbuilding Co. K.S.C.) in Kuwait for KOC FEED
PIPELINES FOR NEW REFINERY PROJECT (PIPELINE PIGGABLE DRIP BARREL)
4) Al Mulla Group in Kuwait for KOC FEED PIPELINES FOR NEW REFINERY PROJECT(FIRE WATER
& JOCKEY PUMPS)
5) Petrocorp Kuwait for KOC FEED PIPELINES FOR NEW REFINERY PROJECT (PACKAGED SUBSTATION)
June 2018 to October 2018
Welding Inspector at FINCANTIERI s.p.a (Monfalcone Shipyard) on behalf of RINA
Jan 2018 to March 2018
Site representative on behalf of Saipem at BAOSTEEL China for MANIFA PROJECT (20’’ & 42’’ welded pipes)
July 2017 to Dec 2017
QC coordinator on behalf of ENI at TMK (RUSSIA) for ZOHR DEVELOPMENT PROJECT.
Inspection of 8’’ seamless pipe
January 2017 to July 2017
Client Representative on behalf of Saipem at TPCO China (Tianjin China) for the following projects :
1) Marjan & Zuluf
2) Safanya
3) Abu Safa Project
December 2016
QC inspector on behalf of Dubai Petroleum at Vallourec France (OCTG pipe).
October 2016 – November 2016
Expeditor on behalf of Tozzi/Comart at Dillinger Hutte (Germany) on Zohr-Slug Catchers
Project (PRESSURE VESSEL/SEPARATOR)
July 2016 – October 2016
QC inspector on behalf of ENI spa at Dillinger Hutte (Germany) on Zohr Project (Fabrication
of Heavy Plate)
June-July 2016
QC inspector on behalf of JGC Coorportion at Purolator Advanced Filtration (Belgium) on
JAZAN REFINERY AND TERMINAL PROJECT ( equipment : FINES FILTERS)
.
March 2016-June 2016
Technical Clerk on behalf of SNAM RETE GAS at ILVA SPA (Italy). Material : Pipe 16'' X 11,1
Grade L 360 MB.
Major Responsibility:
-Technical reports with the supplier
-To issue production/inspection reports
-To verify and analyze the production reports, issued by supplier
-To process the production/quality collection data of supplier by IT systems
-Expediting activity
-To issue Inspection release note
Feb 2016
Inspection and testing of pipes 2" sch. 80, UNS S32760 at Tubacex Tubos Inoxidables, –
Llodio (Alava) Spain on behalf of Aker Solutions Malaysia Project: Dalia WP10 e Dalia
Phase 2A
Sept 2015-Feb 2016
Client Representative on behalf of Khalda Petroleum Company at Tubos Reunidos
Industrial,S.L.U. (Amurrio,Spain). Supervision & Testing of 6" Sch. 80 C.S. SEAMLESS
FLOW LINES.
2014-2015
Flowline Package Quality Engineer (KAMBO PROJECT) – Technip France (headquarter office)
JOB DESCRITPION
– Support the package in the implementation of CONTRACT Quality requirements
during design, engineering, procurement, fabrication and installation until delivery of
the final documentation;
– Support the Quartz deployment within the package (support the organization of
FMECA, support the implementation of KPIs, Issue Quality Alert, promote the
formalization of lessons learnt and best practices);
– Be involved in Design Reviews and D FMECA’s (Design Failure Mode Effect and
Cause Analysis) on critical equipment/materials;
– Assess the capability of Suppliers and Subcontractors to meet Kaombo project
requirements through evaluation and depending of the Equipment/materials
Criticality Rating, and the Manageability Rating of the Supplier;
– Lead Supplier and Subcontractor qualification according to TECHNIP and CONTRACT
Vendor qualification requirements;
– Ensure the implementation of the Quality surveillance Policy at Supplier and
Subcontractor based on criticality rating (and P-FMECA if applicable) throughout the
execution of the Purchase Order or the Subcontract;
– Take the ownership of Supplier and Subcontractor Quality Document review
(particularly Project Quality Plans, Quality Control Plans, Final documentation);
– Organize and chair Pre-Inspection meetings at Suppliers and Subcontractors;
– Take the ownership of the nonconformity management process within the assigned
Package and ensure follow up until close out to the satisfaction of all involved
parties (COMPANY, TECHNIP, Supplier, Subcontractor, Third party);
– Take the ownership of investigations further to NCRs requiring a root cause analysis;
– Review Inspection reports and records and take necessary actions to clarify and
resolve any issue;
– Support the Installation Engineering teams in the development of inspection and
tests plans and procedures;
– Regularly review Quality Records generated within the Package for insertion into the
Final Documentation;
– Perform regular visits at supplier and subcontractor to verify the implementation of
the Quality Surveillance policy and assist in the resolution of Quality Issues;
2014-2015
– Inspection and testing of 18’’ seamless pipes at Tenaris Dalmine (Italy) / Pipe Mill as
Quality Control Inspector on behalf of Technip. Main activities and responsabilies :
2013-2014
– Supervision & testing of PE Pipes, tubing,casing & coupling material at VALLOUREC &
MANNESSMANN TUBES on behalf of ADCO for PO 92244328
– Supervision & testing of PE Pipes, tubing,casing & coupling material at VALLOUREC &
MANNESSMANN TUBES on behalf of TCO
– Inspection, supervision of assembling and testing of diesel engines at Miretti /
Colombo – Alcamo (TP) Italy on behalf of CAIRN Energy India Ltd. RAAVA Field
Project.
– Inspection and testing supervision of 18’’ x 9,53mm L415/X60M PSL2 , 18’’x
12,7mm L415M/X60M PSL2 at Ilva spa (Taranto) on behalf of BUREAU VERITAS
KOREA CO LTD, Project KIRKUK – BAIJI LPG & DRY GAS PIPELINE EPC PROJECT.
– Inspection and testing of raw pipes Pos.20 – 6”x7,10×12 and Pos.30 – 6”x7,10×12 at
RGS LARINO on behalf of Snamprogetti.
2011-2012
– QC Coordinator/Team leader (on behalf of Technip USA) at SIMAS S.p.A. for Hadrin
South Project ( Bends Items 10’’ & 8’’).
– QC Coordinator/Team leader (on behalf of Technip USA) at Tenaris Dalmine (Italy)
for Hadrian South Project ( 8’’ & 10’’ API 5L X65 pipes)
– Client Representative (on behalf of Saipem S.p.A.) at Jindal (Mundra – India) for
GLNG Project – 42’’ steel pipes (bare pipe and coated pipe – 400kms ).
– October 2016 – at present
QC Inspector/Expeditor on behalf of Tozzi/Comart at Dillinger Hutte (Germany) on
Zohr-Slug Catchers Project
– Expeding, inspection and testing of Flanges at Supplier Stainalloy Nederland B.V. –
Sliedrecht TheNetherlands on behalf of Rina Industry / Keppel Kazakhstan LLP. –
Agip Kazakhstan new piperacks Project. P.Order n°200171.
132 total views, 1 today