Figura professionale: 3D PDMS Administration

Nome Cognome: Y. W.Età: 60
Cellulare/Telefono: Riservato!E-mail: Riservato!
CV Allegato: Riservato!Categoria CV: Engineering
Sede preferita: Norway 

Accesso Full al database con 29.990 CV a partire da € 5,00    ABBONATI SUBITO!



Sommario

3D PDMS Administration

Esperienze

 2018.1.- until now -Sembcorp Marine ,Singapore

PDMS/ E3D Admin.
PDMS Global setup/management
Develop in house program to improve process
Front End user’s support and trouble shotting
C&S CUSTOMIZATION AND MAINTAIN
Project : Statoil’s Johan Casteberg FPSO , Collobartion with Aker solution Norway 

2011.03 – 2017.11.31 Aibel Pte.,Ltd Singapore,Norway

PDS/PDMS Project Creation and Administration

FPSO/Offshore platform modification work. PDMS GLOBAL – Statoil , Aibel Norway,Singapore,Thailand

PDMS Global/Satellite db setup, maintain, PML, in-house program development

Project: Statoil V&M ,Troll A, JSDP ,ConocoPhillips GEM ,

BW off shore’s Catcher FPSO, Woodside GED project

2010.01 – 2011.02 Fu-Tai Engineering Co., Ltd., Taipei, Taiwan

PDS/PDMS Project Creation and Administration

Petrochemical plant design, 3D design administration & custormarization

Multi-location 3D model design platform setup and coordination

2008 – 2009.12 Entech Project Service LLC, Houston, USA

PDMS Supervisor/Admnistrator

PDS/PDMS Project Creation and Administration

·           Customisation and integrated Isometric/Draft/Design environment.

·           Administering PDS and providing PDS application support,

·           Piping Designer, Equipment Modeler, Interference Manager, Design Review Integrator, Reference Database (Specifications), Report Manager, Isogen, Drawing Manager, Frameworks Plus, EE_Raceway, , Eden code creation for piping and equipment.

·           producing user documentation for the purposes of work force training and standardization of practices.

·         All the PDS/PDMS project creation, Admin & Paragon Task ,Cat & Spec. Creation,.ISO extraction , MTO/clash report

·           Remote access to Maintain PDS/PDMS server that located in USA by LogMeIn

·           Project Owner.(Air Products )

·           PDS/PDMS study & development , Customarization

·           Project Setup / Database Administration, Managing Data / File Servers.

·           Use PlantWave to GENERATE GA drawings on PDS/PDMS platform.

·           Use Naviswork ,Aveva review, SmartPlant Review , Octaga Viewer to model review

·           PDMS/PDS 3D design shop setup and built in Bogota,Colombia. Also give Training course.

·   Database Administration & Maintenance

·   PDMS Setup & Support, including Draft, ISODraft, Review

·   Catalogues and Specifications , Creation & Maintenance

·   Appware customisation using PML

·                     Experience with AVEVA Global, OPENSTEEL, Implant & Explant REVIEW

 2003 – 2007 Fu-Tai Engineering Co., Ltd., Taipei, Taiwan

PDMS Supervisor/Admnistrator       

PDMS GLOBAL infrastructure and Specification Creation , Physical Support Design Function  creation in PDMS model,

·           PDS Project Administration

.PDS Project Administration
.PDS Project Setup
.Extracting Isometric Drawings Management
.PDS Clash Detection
.Reports Management
.Drawing Manager Setup
.RDB Management

·           Customisation and integrated Isometric/Draft/Design environment.

·           All the PDS/PDMS Admin & Paragon Task, Cat & Spec. Creation.

·           Overseas kick-off meeting on Germany & Switzerland.(Alstom/Uhde)

·           Overseas working in Japan.(Toyo Engineering Co.,Ltd)

·           PDS/PDMS study & development.

·           Project Setup / Database Administration, Managing Data / File Servers.

·           PDMS Project Setup / Operation / PDMS 3D Modeling / Managing the CAD Systems, Customization,

·           Design Check Model Integrity & supervision

·           Train CAD & 3D MODEL personnel

·           Prepare PDMS 3D model, isometric drawing, Clash detection

·           General arrangement & mto

·           Supervise Drafting and Detailed Design.Dragon steel Co.,Ltd. Phase I (By product)

Clients/projects involved:

·           Uhde Gmbh , ThyssenKrupp in Germany / Project : EG IV -Nan YA Plastic CO.,LTD

·           NAN YA Plastic Co.,Ltd /Pipelines over 5,000  / Equipments  over 500 pcs

·           Formosa Petrochemical Co., Ltd. /Project : Olefin III (Pipelines over 3,000/ Equipments over 250 pcs )

·           Formosa Petrochemical Co., Ltd. /Project : Butadiene Extraction Unit plant in No. 6 Naphtha Cracker Formosa Petrochemical Co., Ltd

·           Formosa Petrochemical Co., Ltd. /Pipelines over 4,000 / Equipments over 350 pcs

·           Formosa Plastic (USA) / SPVC project

PDS Project setup and maintenance, Coordination of Model Review, Databank preparation, Interference detection, Troubleshooting and Training, Isometric extraction, 60% and 90 % formal model review, MTO and inconsistency check, Preparation Check & control procedure, Project archival an restoration.

Clients/projects involved:

·           PEQUIVEN MORON FERTILIZER PROJECT / (1,800 MTPD ammonia/2,200 MTPD UREA PLANT)

Client : Toyo Engineering Co., Ltd. (ongoing) & PETROQUIMICA DE VENEZUELA S.A,VENEZUELA

2002 – 2003 Atomtech Engineering Co., Ltd., Taipei, Taiwan

PDMS Group Leader

·           Coordination with client, support design in PDMS model, preparing 2D support drawings, sizing support according to client stress report.

·           Preparing final isometric drawing, packing list, shipping documents, shop inspection certification, QA/QC documents, prefabricated spool dimension inspection, prefabricated spool marking, coordination on Brazil site.

Clients/projects involved:

·           Alstom Power (Switzerland) / TermoRio (Brazil) Power Plant Unit I & II & III

·           Alstom Power (Switzerland) / Piping prefabrication and piping supporting element supply of PERLIS Power Plant in Thailand

           1988 – 2001 Fu-Tai Engineering Co., Ltd., Taipei, Taiwan

Piping Engineer / CAD Dept. Supervisor

·           PDMS Group Leader

·           PDMS administration / paragon / customization / PML

·           Design / paragon / iso drawing / clash / support / 3D model R&D

·           Piping arrangements & detail design, layout, general arrangement and detail drawing for piping, piping supports, isometric in PDMS 3D model.

·           Piping design modifications to drwings, line lists, valve lists, equipment arrangements as required to incorporate field changes & redesign for project under construction

·           Preparing isometric drawing / material specification and build 3D model in AutoPLANT 3D environment for client’s review.

·           Prepare Isometric sketch for client to input into PDMS model.

Clients/projects involved:

·           Formosa petrochemical Expoxy project

·           NAN YA Plastic Corp./CCL projec

·           Formosa plastics / SM2 OSBL project

·           Formosa plastics /  PTA project

·           Chinese Potroleum Corp./ Fire fighting piping, fire pump house

·           Formosa  Fiber Corp./ PTA project.

·           Taipower Co. Tai-Chung Power Plant

Software knowledge: Proficient in the use of E3D,PDMS , CADWorx Plant, AutoPLANT, AVEVA REVIEW,SmartPLANT review,Spoolgen,NavisWork,PLANTWAVE,AutoCAD,MicroSTATION, PML, MDL,VB, Python,LSP, Microsoft Windows and NT, Microsoft Office, and many other software programs

EDUCATION

B.S. Mechanical Engineering, Chung-Yuan University, Taiwan – 1986

Improvement Courses:

·           Intergraph PDS Basic & Advanced training (Mainland China)-2007

·           CPDS1103  Windows and CAD for PDS

·           CPDS3102  Creating Equipment Models with PDS 3D

·           CPDS3103  Creating Piping Models with PDS 3D

·           CPDS3104 PDS Orthographic drawing Setup for Administrators

·           CPDS3105  PDS Interference Detection

·           CPDS3109  Extraction Isogen Drawings with PDS 3D

·           CPDS3108 PDS Report

·           CPDS3115 PDS Support Models

·           CPDS3117  PDS Stress Analysis

·           CSCR8003  FrameWorks Plus

·           CEDE6111  EE Raceway Modeling Operation

·           CPDS3001 PDS Project Setup

·           CPDS3100 PDS Project Administrator

·           CPDS3107 Spec Writing with PDS 3D

·           Toyo Engineerinng – PDS QC/MTO/PIPE SUPPORT Training (Japan)

·           UHDE Gmbh, ThyssenKrupp, PDMS GLOBAL & PIPE SUPPORT (Germany

147 total views, 2 today