Figura professionale: 3D PDMS Administration
Nome Cognome | : Y. W. | Età | : 61 |
---|---|---|---|
Cellulare/Telefono | : Riservato! | : Riservato! | |
CV Allegato | : Riservato! | Categoria CV | : Engineering |
Sede preferita | : Norway |
Accesso Full al database con 30.001 CV a partire da € 5,00 ABBONATI SUBITO!
Sommario
Esperienze
2018.1.- until now -Sembcorp Marine ,Singapore
PDMS/ E3D Admin.
PDMS Global setup/management
Develop in house program to improve process
Front End user’s support and trouble shotting
C&S CUSTOMIZATION AND MAINTAIN
Project : Statoil’s Johan Casteberg FPSO , Collobartion with Aker solution Norway
2011.03 – 2017.11.31 Aibel Pte.,Ltd Singapore,Norway
PDS/PDMS Project Creation and Administration
FPSO/Offshore platform modification work. PDMS GLOBAL – Statoil , Aibel Norway,Singapore,Thailand
PDMS Global/Satellite db setup, maintain, PML, in-house program development
Project: Statoil V&M ,Troll A, JSDP ,ConocoPhillips GEM ,
BW off shore’s Catcher FPSO, Woodside GED project
2010.01 – 2011.02 Fu-Tai Engineering Co., Ltd., Taipei, Taiwan
PDS/PDMS Project Creation and Administration
Petrochemical plant design, 3D design administration & custormarization
Multi-location 3D model design platform setup and coordination
2008 – 2009.12 Entech Project Service LLC, Houston, USA
PDMS Supervisor/Admnistrator
PDS/PDMS Project Creation and Administration
· Customisation and integrated Isometric/Draft/Design environment.
· Administering PDS and providing PDS application support,
· Piping Designer, Equipment Modeler, Interference Manager, Design Review Integrator, Reference Database (Specifications), Report Manager, Isogen, Drawing Manager, Frameworks Plus, EE_Raceway, , Eden code creation for piping and equipment.
· producing user documentation for the purposes of work force training and standardization of practices.
· All the PDS/PDMS project creation, Admin & Paragon Task ,Cat & Spec. Creation,.ISO extraction , MTO/clash report
· Remote access to Maintain PDS/PDMS server that located in USA by LogMeIn
· Project Owner.(Air Products )
· PDS/PDMS study & development , Customarization
· Project Setup / Database Administration, Managing Data / File Servers.
· Use PlantWave to GENERATE GA drawings on PDS/PDMS platform.
· Use Naviswork ,Aveva review, SmartPlant Review , Octaga Viewer to model review
· PDMS/PDS 3D design shop setup and built in Bogota,Colombia. Also give Training course.
· Database Administration & Maintenance
· PDMS Setup & Support, including Draft, ISODraft, Review
· Catalogues and Specifications , Creation & Maintenance
· Appware customisation using PML
· Experience with AVEVA Global, OPENSTEEL, Implant & Explant REVIEW
2003 – 2007 Fu-Tai Engineering Co., Ltd., Taipei, Taiwan
PDMS Supervisor/Admnistrator
PDMS GLOBAL infrastructure and Specification Creation , Physical Support Design Function creation in PDMS model,
· PDS Project Administration
.PDS Project Administration
.PDS Project Setup
.Extracting Isometric Drawings Management
.PDS Clash Detection
.Reports Management
.Drawing Manager Setup
.RDB Management
· Customisation and integrated Isometric/Draft/Design environment.
· All the PDS/PDMS Admin & Paragon Task, Cat & Spec. Creation.
· Overseas kick-off meeting on Germany & Switzerland.(Alstom/Uhde)
· Overseas working in Japan.(Toyo Engineering Co.,Ltd)
· PDS/PDMS study & development.
· Project Setup / Database Administration, Managing Data / File Servers.
· PDMS Project Setup / Operation / PDMS 3D Modeling / Managing the CAD Systems, Customization,
· Design Check Model Integrity & supervision
· Train CAD & 3D MODEL personnel
· Prepare PDMS 3D model, isometric drawing, Clash detection
· General arrangement & mto
· Supervise Drafting and Detailed Design.Dragon steel Co.,Ltd. Phase I (By product)
Clients/projects involved:
· Uhde Gmbh , ThyssenKrupp in Germany / Project : EG IV -Nan YA Plastic CO.,LTD
· NAN YA Plastic Co.,Ltd /Pipelines over 5,000 / Equipments over 500 pcs
· Formosa Petrochemical Co., Ltd. /Project : Olefin III (Pipelines over 3,000/ Equipments over 250 pcs )
· Formosa Petrochemical Co., Ltd. /Project : Butadiene Extraction Unit plant in No. 6 Naphtha Cracker Formosa Petrochemical Co., Ltd
· Formosa Petrochemical Co., Ltd. /Pipelines over 4,000 / Equipments over 350 pcs
· Formosa Plastic (USA) / SPVC project
PDS Project setup and maintenance, Coordination of Model Review, Databank preparation, Interference detection, Troubleshooting and Training, Isometric extraction, 60% and 90 % formal model review, MTO and inconsistency check, Preparation Check & control procedure, Project archival an restoration.
Clients/projects involved:
· PEQUIVEN MORON FERTILIZER PROJECT / (1,800 MTPD ammonia/2,200 MTPD UREA PLANT)
Client : Toyo Engineering Co., Ltd. (ongoing) & PETROQUIMICA DE VENEZUELA S.A,VENEZUELA
2002 – 2003 Atomtech Engineering Co., Ltd., Taipei, Taiwan
PDMS Group Leader
· Coordination with client, support design in PDMS model, preparing 2D support drawings, sizing support according to client stress report.
· Preparing final isometric drawing, packing list, shipping documents, shop inspection certification, QA/QC documents, prefabricated spool dimension inspection, prefabricated spool marking, coordination on Brazil site.
Clients/projects involved:
· Alstom Power (Switzerland) / TermoRio (Brazil) Power Plant Unit I & II & III
· Alstom Power (Switzerland) / Piping prefabrication and piping supporting element supply of PERLIS Power Plant in Thailand
1988 – 2001 Fu-Tai Engineering Co., Ltd., Taipei, Taiwan
Piping Engineer / CAD Dept. Supervisor
· PDMS Group Leader
· PDMS administration / paragon / customization / PML
· Design / paragon / iso drawing / clash / support / 3D model R&D
· Piping arrangements & detail design, layout, general arrangement and detail drawing for piping, piping supports, isometric in PDMS 3D model.
· Piping design modifications to drwings, line lists, valve lists, equipment arrangements as required to incorporate field changes & redesign for project under construction
· Preparing isometric drawing / material specification and build 3D model in AutoPLANT 3D environment for client’s review.
· Prepare Isometric sketch for client to input into PDMS model.
Clients/projects involved:
· Formosa petrochemical Expoxy project
· NAN YA Plastic Corp./CCL projec
· Formosa plastics / SM2 OSBL project
· Formosa plastics / PTA project
· Chinese Potroleum Corp./ Fire fighting piping, fire pump house
· Formosa Fiber Corp./ PTA project.
· Taipower Co. Tai-Chung Power Plant
Software knowledge: Proficient in the use of E3D,PDMS , CADWorx Plant, AutoPLANT, AVEVA REVIEW,SmartPLANT review,Spoolgen,NavisWork,PLANTWAVE,AutoCAD,MicroSTATION, PML, MDL,VB, Python,LSP, Microsoft Windows and NT, Microsoft Office, and many other software programs
EDUCATION
B.S. Mechanical Engineering, Chung-Yuan University, Taiwan – 1986
Improvement Courses:
· Intergraph PDS Basic & Advanced training (Mainland China)-2007
· CPDS1103 Windows and CAD for PDS
· CPDS3102 Creating Equipment Models with PDS 3D
· CPDS3103 Creating Piping Models with PDS 3D
· CPDS3104 PDS Orthographic drawing Setup for Administrators
· CPDS3105 PDS Interference Detection
· CPDS3109 Extraction Isogen Drawings with PDS 3D
· CPDS3108 PDS Report
· CPDS3115 PDS Support Models
· CPDS3117 PDS Stress Analysis
· CSCR8003 FrameWorks Plus
· CEDE6111 EE Raceway Modeling Operation
· CPDS3001 PDS Project Setup
· CPDS3100 PDS Project Administrator
· CPDS3107 Spec Writing with PDS 3D
· Toyo Engineerinng – PDS QC/MTO/PIPE SUPPORT Training (Japan)
· UHDE Gmbh, ThyssenKrupp, PDMS GLOBAL & PIPE SUPPORT (Germany
149 total views, 1 today