Figura professionale: Management Engineer / Industrial Engineer

Nome Cognome: M. L.Età: 35
Cellulare/Telefono: Riservato!E-mail: Riservato!
CV Allegato: Riservato!Categoria CV: Engineering
Sede preferita: Milano

Accesso Full al database con 29.989 CV a partire da € 5,00    ABBONATI SUBITO!



Sommario

Management Engineer / Industrial Engineer

Esperienze

Planning Engineer

May 2016–Feb 2017

C.I. Energía Solar ES Windows, Barranquilla (Colombia)
https://eswindows.com/ 

-Planned projects' work schedules according to the availability of materials, plant capacity, and customer’s requirements.
-Analyzed and supervised the status and progress of the assigned projects.
-Contributed to the reduction in the number of customer complaints by an improvement of 30% in schedule compliance.
-Supported the implementation of the Just-in-Time method in the assembly lines.

 

Logistics Engineer

Oct 2013–May 2016

C.I. Energía Solar ESWindows, Barranquilla (Colombia)
https://eswindows.com/ 

-Worked managing and supervising the requirements of raw material at the beginning and during the manufacturing process.

-Created and implemented a graphical control methodology to track the state of the project's raw material requirements. The document was sent to the engineering department every week, summarizing and standardizing the information regarding materials and schedule deadlines.

 

Production Planning & Scheduling Engineer

Feb 2012–Aug 2013

Hydraulic Systems S.A., Barranquilla (Colombia)
https://hscol.com.co/ 

-Planned machine schedules according to time and resource availability.
-Contributed to the improvement of the current production scheduling software to optimize the whole scheduling process.

 

Internship: Production Assistant

Jan 2011–Jun 2011

Arcelor Mittal Colombia, Barranquilla (Colombia)
https://corporate.arcelormittal.com/ 

-Achieved reducing the time spent on the preparation of a production order from 10 minutes to 2 minutes through their redesign and standardization.
-Developed a project based on the implementation of the MRP methodology to reduce downtime in the plant caused by the lack of inputs.

 

 

205 total views, 1 today