Figura professionale: Project Engineer

Nome Cognome: A. Y.Età: 32
Cellulare/Telefono: Riservato!E-mail: Riservato!
CV Allegato: Riservato!Categoria CV: Engineering
Sede preferita: Pesaro o Fano

Accesso Full al database con 29.998 CV a partire da € 5,00    ABBONATI SUBITO!



Sommario

Project Engineer

Esperienze

WORK EXPERIENCE

 SUMMARY

Name and address of employer

IMPROTEX INDUSTRIES

Type of business or sector

METAL CONSTRUCTION

Dates

FROM 28/10/16 TO 29/01/18

Project / Client

AGI Steel Structures for Southern Caucasian Pipeline Expansion (SCPX) / SAIPEM

Occupation or position held

PROJECT ENGINEER

Main activities and responsibilities

·     Monitoring of prefabrication, blasting, welding, painting and galvanizing activities

·     Visual inspection of welding at the workshop

·     Reporting to Client about progress of the activities and attend to the meetings related to welding and painting procedures and Quality

Name and address of employer 

HALLIBURTON

Type of business or sector

PIPELINE SERVICES/ OIL & GAS

Dates

FROM 01/08/2017  01/09/2017

Project / Client

Hydro Leak Testing / Bolting for Shah Deniz Terminal  TAR 2017 (shutdown)  / BRITISH PETROLEUM

Occupation or position held

PROJECT ENGINEER

Main activities and responsibilities

·     Preparation of Bolting Work Packs (calculation of Lbft for torqueing )

·     Flange management

·     Control/record of job progress and completion in respect of man-hours, equipment and consumables to grant compliance with deadlines

·     Attended with Client in all Operation and Shutdown meeting

·     Line walk with client operator in checking all the isolation against marked P&ID and Isolation check list

Name and address of employer 

HALLIBURTON

Type of business or sector

PIPELINE SERVICES/ OIL & GAS

Dates

FROM 01/11/2015  22/01/2016

Project / Client

Hydro Leak Testing / Boltingfor WA Produced Water System / AMEC FOSTER WHEELER

Occupation or position held

PROJECT ENGINEER

Main activities and responsibilities

·     Preparation of Test Packs (Hydro-test, Helium Leak test, Strength test)

·     Preparation of Bolting Work Packs (calculation of Lbft for torqueing and calculation of pressure for tensioning)

·     Control/record of job progress and completion in respect of man-hours, equipment and consumables to grant compliance with deadlines

·     Attend with Client in all meetings

Name and address of employer

HALLIBURTON

Type of business or sector

PIPELINE SERVICES / OIL & GAS

Dates

FROM 01/10/2015 TO  01/11/2015

Project / Client

Commissioning of Subsea Produced Water Pipeline CA CWP  to WA PDQ 14” / WOOD GROOP

Occupation or position held

PROJECT ENGINEER

Main activities and responsibilities

·     Preparation of Test packs

·     Pigging (clean & caliper)

·     Ensuring all procedures and calculations are submitted to the client for review and approval

·     Attend to project coordination meeting with PMT & Client

.Name and address of employer

HALLIBURTON

Type of business or sector

PIPELINE SERVICES/ OIL & GAS

Dates

FROM 01/08/2015  01/10/2015

Project / Client

Hydro Leak Testing / Bolting for Sangachal Terminal – EOP TAR 2015 (shutdown) / BRITISH PETROLEUM

Occupation or position held

PROJECT ENGINEER

Main activities and responsibilities

·     Preparation of Bolting Work Packs (calculation of Lbft for torqueing and calculation of pressure for tensioning)

·     Flange management

·     Dealing with Client, requesting PTW

·     Photo inspection

·     Control/record of job progress and completion in respect of man-hours, equipment and consumables to grant compliance with deadlines

·     Attended with Client in all Operation and Shutdown meetings

·     Line walk with client operator in checking all the isolation against marked P&ID and Isolation check list

Name and address of employer

HALLIBURTON

Type of business or sector

PIPELINE SERVICES / OIL & GAS

Dates

FROM 01/03/2015 TO 01/08/2015

Project / Client

Hydro Leak Testing & Bolting for DWG Produced Water System / BRITISH PETROLEUM&AMEC FOSTER WHEELER

Occupation or position held

PROJECT ENGINEER

Main activities and responsibilities

·       Preparation of Test packs

·       Engineering (man-hours) calculation from onshore and offshore

·       Calculation of Lbft for torqueing and calculation of pressure for tensioning for Bolting through software “Adviser”

·       Project Tracking progress

·       Control/record of job progress and completion in respect of man-hours, equipment and consumables to grant compliance with deadlines

·       Provide full support as required by the Management and PMT for all activities

·       Ensuring all procedures and calculations are submitted to the client for review and approval

·       Attend to project coordination meetings with PMT & Client

Name and address of employer

HALLIBURTON

Type of business or sector

PIPELINE SERVICES / OIL & GAS

Dates

FROM 01/08/2014 TO 01/03/2015

Project / Client

Helium/Nitrogen Leak Testing  for Chirag Gas Cap / BRITISH PETROULEM

Occupation or position held

PROJECT ENGINEER

Main activities and responsibilities

·       Preparation of Test packs

·       Project Tracking progress

·       Control/record of job progress and completion in respect of man-hours (onshore and offshore personnel), equipment and consumables to grant compliance with deadlines

·       Ensuring all procedures and calculations are submitted to the client for review and approval

·       Attend to project coordination meetings with PMT & Client

Personal skills and competences

Mother tongue(s)

RUSSIAN, AZERI

Other language(s)

ENGLISH C1

TURKISH C2

ITALIAN A2

 

185 total views, 1 today