Figura professionale: PROJECT ENGINEER / TECHNICAL MANAGER / PROJECT MANAGER
Nome Cognome | : A. D. | Età | : 56 |
---|---|---|---|
Cellulare/Telefono | : Riservato! | : Riservato! | |
CV Allegato | : Riservato! | Categoria CV | : Project Manager/Architetto SW/ IT Manager |
Sede preferita | : italia nord |
Accesso Full al database con 29.999 CV a partire da € 5,00 ABBONATI SUBITO!
Sommario
Esperienze
MOSSI & GHISOLFI LE (M&G Group)
Position: CONSTRUCTION PROJECT MANAGER Period: March 2017– actual
Project – Client – Country
Period of the project: March 2017 – current
Name of the project: JUMBO PET PLANT – CORPUS CHRISTI (2000 M$ project)
Client: MOSSI & GHISOLFI LE – M&G Group
Country: USA (Texas) – Corpus Christi – Joe Fulton Intl Corridor
Working experience detail: CONSTRUCTION PROJECT MANAGER for Continuous Polymerization Unit of largest world PET Plant.
Starting from March CONSTRUCTION PROJECT MANAGER for the unit of
Continuous Polymerization CP of Jumbo Project at site in CORPUS CHRISTI (area of
about 410 ha for a plant of 1.1 million of tons PET).
Involvement in piping, steel structures, Material Management for the development of
work packages
http://www.chemicals-technology.com/projects/-mg-pet-plant-corpus-christi-texas/
Resume – Andrea De Vita – andrea.devita1969@libero.it
BIOCHEMTEX (M&G Group)
Position: Senior PROJECT MANAGER Period: April 2015 – March 2017
Project – Client – Country
Period of the project: April 2015 – March 2017
Name of the project: Bioethanol Projects on PROESATM Technology – BEST Crescentino
Client: IBP – MOSSI & GHISOLFI Group
Country: Italy – Piedmont (Crescentino – VC)
Working experience detail: PROJECT MANAGER for plant modifications at Crescentino bioethanol Site (10 M$)
Starting from 2015 September 1st Project Manager & PEM for IBP plant (MOSSI
GHISOLFI Group) working for Biochemtex Tortona (AL) for the revamping project of
2nd generation bioethanol plant in Crescentino (VC). Management of a project team
for EPC activities inside the plant.
Starting from 2014 August 5th PROJECT MANAGER working in BIOCHEMTEX
TORTONA for 2nd generation bioethanol plant in China Fuyang – Anhui Province with
partner CHEMTEX Shangai.
http://www.biochemtex.com/en/proesa
BIOCHEMTEX (M&G Group)
Position: PROJECT ENGINEERING MANAGER Period: December 2013 – March 2015
Project – Client – Country
Period of the project: December 2013 – March 2015
Name of the project: Bioethanol Projects on PROESATM Technology
Client: KORONAGRO, CHEMTEX USA, M&G group
Country: various (Italy, Ukraine, China, USA)
Working experience detail: PROJECT & PROCESS ENGINEERING MANAGER from Tortona (AL) – Italian head
office.
From December 1st working as PEM in BIOCHEMTEX TORTONA for 2nd generation
bioethanol plant feasibility studies for Ukraine and GREG projects (Green Ethylene
Glycol)
http://www.biochemtex.com/en/references/other-projects
Resume – Andrea De Vita – andrea.devita1969@libero.it
ABB S.p.A. – PA Division – Oil & Gas
Position: PROJECT MANAGER – PW1/PW10 ENI CONGO Period: June 2013 – November 2013
Project – Client – Country
Period of the project: 2010 – 2013
Name of the project: Congo M’BOUNDI FIELD DEVELOPMENT ENHANCEMENT PROGRAM PW1/PW10
(150 M$ / 20 M$ projects)
Client: ENI CONGO
Country: Milan (Italy) – Pointe Noire (Congo) REPUBLIC OF CONGO
Working experience detail: PROJECT MANAGER in Oil & Gas Department @ H.O. of Sesto San Giovanni MILAN.
From June 2013 Project Manager in ABB Oil & Gas with Client ENI CONGO for 2
projects; Gas Compression and Treatment PW1 / Water Injection Improvement PW10 in
Sesto San Giovanni MILAN.
Task force management with reporting to Area Manager / Project Director.
Functional reporting to Engineering Department (out of task force)
http://www.abb.com/cawp/seitp202/262767ed7738b00fc1257886002ff63b.aspx
ABB S.p.A. – PA Division – Oil & Gas
Position: deputy PROJECT MANAGER – PW1 ENI CONGO Period: October 2010 – Maj 2013
Project – Client – Country
Period of the project: 2010 – 2012
Name of the project: Congo M’BOUNDI FIELD DEVELOPMENT ENHANCEMENT PROGRAM PW1/PW10
(150 M$ / 20 M$ projects)
Client: ENI CONGO
Country: Genoa – Milan – Pointe Noire (Congo) REPUBLIC OF CONGO
Working experience detail: Project Management in Oil & Gas Department
From March 2011 deputy PROJECT MANAGER in ABB Oil & Gas with Client ENI
CONGO for 2 projects; Gas Compression and Treatment PW1 / Water Injection
Improvement PW10 in Sesto San Giovanni MILAN.
From October 2010 to February 2011 early engineering for ENI CONGO PW1 project.
ABB S.p.A. – PA Division – Oil & Gas
Position: Senior PROJECT ENGINEER – WP5 ENI CONGO Period: March 2008 – September 2010
Project – Client – Country
Period of the project: 2008 – 2010 (31 months)
Name of the project: Integrated Power Plant – WP5 New power generation plant open cycle aimed at
providing 320 MW electrical power to the ENI Oil & Gas plants. The plant includes 2
ANSALDO Energia gas turbine generators 160 MW each (more than 320 M$ project)
Client: ENI CONGO
Country: Genoa (Italy) – Milan (Italy) – Pointe Noire (Congo) REPUBLIC OF CONGO
Working experience detail: Project Engineering in Oil & Gas Department: Internal and external coordination for
detailed engineering; preparation of technical specifications, procedures and auxiliary
documentation for the specialists; material requisitions; engineering progress control;
technical interface with client.
Team of 40 ABB persons and more than 100000 external engineering man-hours
From March 2008 to September 2010 Senior PROJECT ENGINEER in Genoa offices
of ABB for WP5 ENI CONGO Power plant.
Project of about 320 Meuro and more than 10 Meuro for engineering
http://www.dac-presse.com/actualites/regions/22-pointe-noire/442-la-centrale-electrique-a-gaz-du-congodesormais-operationnelle-.html
SINCO
Position: TECHNICAL DIRECTOR Period: 2007 – 2008
Project – Client – Country
Period of the project: 2007 – 2008
Name of the project: Oil plants (dealers and storage), oil industrial plants, civil agencies
Company: SINCO
Customers: AGIP (eni), ESSO, TOTAL, IP, SHELL, PCM, CMCI Scarl
Country: Italy – Genoa
Working experience detail: TECHNICAL DIRECTOR
Design, Construction and revamping of oil plants (dealers and large storages).
Coordination of a team of 12 people.
From January 2007 Proposal Engineer and Proposal Manager for Photovoltaic Plants
with partners such as SUNPOWER Faenza and FEDI IMPIANTI Florence.
Engineering consultancy for large oil storage areas for ENI
EPC for Jet fuel A1 filtration unit for Grottaglie Airport.
Position: TECHNICAL OFFICE & CONSTRUCTION MANAGER Period: 2006
Project – Client – Country
Period of the project: 2006
Name of the project: Oil plants (dealers and storage), oil industrial plants, civil agencies
Company: SINCO (PCM and CMCI Scarl)
Country: Italy – Genoa
Working experience detail: Responsible for the Construction activities with coordination of 4 field inspectors (1 on Milan area, 1 in Vicenza and 2 from Genoa head offices).
Contract management, bids for public and private contracts.
Coordination of external mechanical and electric companies for the construction and the
restructuration of the dealers (like as Agip (eni), Esso, IP, Shell, Total).
Position: plant MAINTENANCE MANAGER Period: 2004 – 2005
Project – Client – Country
Period of the project: 2004 – 2005
Name of the project: Spinetta Marengo Organic Peroxide plant / Production units – Castellazzo BormidaClient: ARKEMA (TOTALFINALELF Group)
Country: Italy- Piedmont (AL)
Working experience detail: PLANT MAINTENANCE MANAGER
Management of internal workshop and of external societies (construction, mechanical,
electrical, refrigerators, insulation, painting) with respect of time, costs, safety.
From September 2004 Maintenance Manager for ARKEMA site, formerly ATOFINA
Italia in Spinetta Marengo (AL) and Castellazzo Bormida (AL) facility, with management
of internal workshop and external contractors (civil works, mechanical, piping, supports,
electrical and instrumentation, HVAC, insulation and painting).
Responsibility in terms of safety, cost, final achievements performances and schedule.
The role was related to the management of about 40 persons with coordination of about
10 internal persons for a site of about 100 workers.
Position: plant TECHNICAL MANAGER Period: 2000 – 2003
Project – Client – Country
Period of the project: 2000 – 2003
Name of the project: Spinetta Marengo Organic Peroxide plant / Production units – Castellazzo Bormida
Client: ATOFINA ITALIA (TOTALFINALELF Group)
Country: Italy- Piedmont (AL)
Working experience detail: PLANT TECHNICAL MANAGER
Responsible for investments, projects, authorization practices. Coordination of project
and management of the team (LPG tanks relocations, powder pneumatic transports
and many new Capex)
Position: plant PROJECT MANAGER Period: 1998 – 2000
Project – Client – Country
Period of the project: 1998 – 2000
Name of the project: Spinetta Marengo Organic Peroxide plant
Client: ELF ATOCHEM ITALIA (ELF Group)
Country: Italy – Piedmont (AL)
Working experience details: CAPEX PROJECT MANAGER
EPC and start up of the plant producing cryogenic peroxide powders mixed with inert
(2M$). Total autonomy for the development of the project without external support for
all disciplines
Position: plant PROCESS ENGINEER Period: March 1996 – MID 1998
Project – Client – Country
Period of the project: 1996 – 1998
Name of the project: Spinetta Marengo Organic Peroxide plant
Client: ELF ATOCHEM ITALIA
Country: Italy – Piedmont
Working experience detail: PLANT PROCESS ENGINEER
Technological and process design.
https://www.arkema.com/en/all-arkema-locations/arkema-in-italy/arkema-in-italian/
Resume – Andrea De Vita – andrea.devita1969@libero.it
ITALIMPIANTI (now Paul Wurth)
Position: PROCESS ENGINEER – AUTOMATION Period: June 1995 – Feb 1996
Project – Client – Country
Period of the project: 1995 – 1996
Name of the project: “Metallurgy and Plants” division – Blast Furnace simulation
Client: internal activity
Country: Italy
Working experience detail: Process Engineering activities in Automation Department. Blast furnace process
simulation with Fortran software simulation and Visual Basic input data interface.
DVCM
De Vita Costruzioni
Meccaniche
Position: Junior PROJECT ENGINEER Period: Nov 1993 – May 1994
Project – Client – Country
Period of the project: 1993 – 1994
Country: Genoa – Italy
Working experience detail: Process engineering activities, design. Drafting. Filter assembling in workshop.
DE VITA International
Position: summer stage Period: Aug 1985 & Aug 1986
Project – Client – Country
Period of the project: summer 1985 – summer 1986
Client: DE VITA Int.
Country: Casella – Genoa – Italy
Working experience detail: technical office drawing archive copies (3000 dwg)
Università degli Studi di Genova
Position: Degree in Chemical Engineering
Master of Science (5 years) Period: Sept 1988 – Nov 1993
Project – Client – Country
Period of the project: 1988 – 1993
Place: Genoa – Università degli Studi di Genova)
Country: Italy
Details of study: Degree in Chemical Engineering – grade 110 /110 and praise
(1st graduate for the session related to years 1988 – 1993)
Liceo G.D. Cassini
Position: Science High School Period: sept 1984 – July 1988
Project – Client – Country
Period of the project: 1984 – 1988
Place: Genoa Liceo Scientifico GD CASSINI
Country: Italy
Details of study: Maturità Scientifica (Science High School) – grade 60 / 60
MOSSI & GHISOLFI Logistic & Engineering Co. – BIOCHEMTEX
2017 Dal 13 Marzo Project Manager della sezione di Continuous Polymerization CP del
progetto PET Jumbo nel sito Corpus Christi (sito di 410 ettari dedicato ad un impianto da 1.1 milioni
di t di PET). Coinvolgimento sulla sezione di Material Management per la preparazione di Work
Packages.
BIOCHEMTEX – MOSSI & GHISOLFI
2015 Dal 1 Settembre Project Manager / PEM presso Biochemtex Tortona (AL) del progetto di revamping
dell’impianto etanolo di Crescentino (VC) per IBP S.r.l. con gestione di un gruppo di progetto
Biochemtex ed attività EPC in stabilimento.
2014 Dal 5 agosto Project Manager presso Biochemtex Tortona del progetto bioetanolo Fuyang nella
provincia di Anhui in Cina per Chemtex Shanghai.
2013 Dal dicembre PEM presso Biochemtex Tortona nel settore Bioetanolo (Mossi &Ghisolfi).
2013 Dal Giugno 2013 Senior Project Engineer & Project Manager presso ABB con Cliente ENI CONGO
per 2 progetti; Compressione e Trattamento Gas PW1 + Water Injection Improvement PW10 in
missione a Sesto San Giovanni (MI). Ruolo in task force con riporto funzionale al Project Director /
Area Manager. Dipendenza funzionale nei dipartimenti ABB come Project Engineer (fuori dalla task
force sopra indicata).
2012 Dal Marzo 2012 Deputy Project Manager presso ABB con Cliente ENI CONGO per 2 progetti;
Compressione e Trattamento Gas – PW1 + Water Injection Improvement PW10 in missione a Sesto
San Giovanni (MI) con riporto funzionale al Project Director.
2010 Dall’Ottobre 2010 Senior Project Engineer & Deputy Project Manager presso ABB con Cliente ENI
CONGO per il progetto Compressione e Trattamento Gas PW1 in missione a Sesto San Giovanni
(MI).
2008 Da Marzo sino a Settembre 2010 Senior Project Engineer a Genova presso ABB per Centrale
Elettrica WP5 ENI CONGO.
Progetto da circa 320 Meuro di cui circa 10 Meuro di ingegneria.
2007 Da Gennaio ulteriore funzione di Tecnico Commerciale Impianti Fotovoltaici di PCM e SINCO
collaborando con SUNPOWER Faenza e FEDI IMPIANTI Firenze.
2006 Da Giugno Technical & Construction Manager di SINCO e PCM società genovesi operanti nel
settore della progettazione, costruzione e manutenzione di impianti petroliferi (depositi e punti
vendita).
2006 Da Gennaio 2006 Direttore Tecnico di SINCO e PCM a Genova, con le mansioni di.
• responsabilità per il settore Costruzioni (Ufficio Lavori) con coordinamento di 4 ispettori esterni: 2 a
Genova, 1 a Milano ed 1 a Vicenza;
• gestione di contratti, offerte per gare pubbliche / private ed appalti;
• coordinamento delle imprese esterne edili, meccaniche ed elettriche per la costruzione e
ristrutturazione di punti vendita di Agip, Esso, IP, Shell, Total.
2004 Da Settembre 2004 Maintenance Manager del Sito ARKEMA, giá ATOFINA Italia di Spinetta
Marengo (AL) e Castellazzo Bormida (AL), con gestione dell'officina interna e delle imprese esterne
(edili, meccanici, elettricisti, frigoristi, coibentatori e verniciatori) in termini di risultato finale, tempi,
costi e sicurezza sul lavoro.
La posizione includeva la gestione di circa 40 persone tra imprese esterne e dipendenti con il
coordinamento di 10 risorse interne su circa 100 dipendenti del Sito.
2000 Da Novembre 2000 Plant Technical Manager di ATOFINA Italia (già ELF ATOCHEM) a Spinetta
Marengo alle dipendenze del Direttore di Stabilimento come Responsabile di investimenti, commesse
e pratiche autorizzative. Coordinatore di progetti.
1998 Da Luglio 1998 Plant Project Manager alle dirette dipendenze del Direttore di Stabilimento di
Spinetta Marengo (AL) di ELF ATOCHEM Italia. Avviamento di impianti complessi.
1996 Da Marzo 1996 Plant Process Engineer presso l’Ente Tecnologia a Spinetta Marengo (AL) presso
ELF ATOCHEM Italia.
Progettazione tecnologica / processistica completa ed autonoma.
ITALIMPIANTI (now Paul Wurth)
1995 Da Giugno a Febbraio 1996 Automation & Process Engineer presso l’Ente Automazione della
Divisione Metallurgia ed Impianti di ITALIMPIANTI a Genova.
DVCM
De Vita Costruzioni Meccaniche
1993 Da Dicembre 1993 a Giugno 1994 prime esperienze di lavoro con apparecchiature di processo
(settore filtrazione) e pratica di progettazione presso la DE VITA COSTRUZIONI MECCANICHE a
Genova.
1994 Dal Giugno 1994 a Maggio 1995 servizio di leva a Merano (BZ) presso gli Uffici Comandi del
Reggimento “Savoia Cavalleria” con il Grado di Caporal Maggiore.
_________________________________________________________________________________
STUDI
1988 Diploma di Maturità SCIENTIFICA presso il Liceo Statale "Gian Domenico Cassini" di Genova;
Voto: 60 / 60
1993 Laurea in INGEGNERIA Chimica presso l'Università degli Studi di Genova, conseguita il 05/11/1993;
Voto: 110 / 110 con Lode
1994 Esame di Stato per l'abilitazione all'esercizio professionale sostenuto il 18 Maggio.
2003 Attestato di frequenza al corso di Sicurezza sul lavoro nei cantieri (D.Lgs. 494/96) presso scuola edile
di Alessandria.
________________________________________________________________________________
LINGUE STRANIERE
– Inglese: parlato e scritto (da Marzo 2017 presso il sito di Corpus Christi in Texas=;
– Francese: parlato e scritto (frequenti soggiorni in paesi francofoni in particolare a Ginevra).
– Spagnolo: conoscenze di base
________________________________________________________________________________
CONOSCENZE INFORMATICHE
PC: Windows, AutoCAD, Office, Word, Excel, Powerpoint, Project.
120 total views, 1 today