Figura professionale: Sap Functional Architect, Project Manager
Nome Cognome | : S. F. | Età | : 59 |
---|---|---|---|
Cellulare/Telefono | : Riservato! | : Riservato! | |
CV Allegato | : Riservato! | Categoria CV | : Project Manager/Architetto SW/ IT Manager |
Sede preferita | : Milano |
Accesso Full al database con 29.999 CV a partire da € 5,00 ABBONATI SUBITO!
Sommario
Esperienze
03/2018-04/2018:
SAP Support Service Transition Managerfor Tata C.S., Milan – Italy
· Contributed on analysing AS IS of the SAP Support Service and designing to be and improvement plan in an multi-systems scenario (2 ECC6, 1 Hana, CRM, and BI) serving 3 Companies having plants across 21 countries
· Prepared Service Transition&Knowledge Transfer Plan and presented to the C-level Representatives of the Client as part of a commercial offer for a SAP Support Service tender
05/2012-12/2017:
Lead ERP Applications (AMS) forShell & NCOC – Kashagan Project, Kazakhstan
· Led/trained internal teams and coordinated external teams (~70 people) providing Support&Delivery E2E24/7 Service (AMS) to Eni, Shell, Total SAP Systems (~7kUsers) on MM WM LE PM QM FI CO PS JVA HR BO Basis
· Mission main points were: provide ERP E2E Support, implement ERP programme, train on the job SAP Teams
· Performed Team building, coaching, and appraising; on boarding interviews; talents developing and retention
· Defined, maintained, and implemented the Service Support Model, Governance, and Strategy. Designed the SAP Change Management process. Led the yearly SAP DR of the 3 SAP systems of the Venture
· KPI, SLA and OLA negotiation, monitoring, and meeting. Conducted periodical surveys on Business satisfaction.
· Held ERP budget and contracts, led operational run&maintain and continuous improvement. Managed business change of ~150 SAP major enhancements. Number of received User Ticket reduced by 30%/year
· Defined and implemented ERP Programme. Upgraded SAP from 4.7×200 to ECC6. Separated Venture Operator SAP from the Agent SAP. Detached the Venture SAP from Shell Global SAP. Merged the 3 SAPs of the Venture
· Provided leadership, guidance and assistance to Team Leads &Project Mangers. ERP top point of escalation in case of complexity, difficulty, or criticality engaging Business Managers at the proper level. Co-chairing the IT CAB
· Managed contracts, interacted with, provided directives to, evaluated performance of internal teams and external Suppliers (mainly Eni SAP CoE, Shell SAP CoE, Accenture, Terralink, DXC, T-System, Algoritmi, Wipro)
· Proposed, estimated RoI, and implemented several Business Processes improvement project initiatives
· Played the role of SAP Design Authority. Overseen all aspects of SAP configuration, maintenance, integration, documentation, knowledge management. Reviewed, supervised, and approved any change in the SAP System
· Performed Demand, Change, Transition, and Risk Management. Defined priorities and assured overall Quality
· Sap lead in the project for merging the 3 SAPs of the Venture in 1 SAP integrating business processes
· Lead SAP SME in the project of SAP Upgrade from 4.7 to ECC6. Coordinated post-go live hypercare
· PM in the implementation of the ProCon Application. Led the RLM functionality activation in SAP
· Led improvement project initiatives such as Optimization of Plant Maintenance and Material Procurement and Shipping processes; Manual Expense Claim, Master Data Governance process; Venture Assets consolidation
06/2007-04/2012:
SAP/ERP Leadfor Eni Agip KCO – Kashagan Project, Kazakhstan
· Led, coached, trained internal teams and coordinated external teams providing Support&Delivery E2E24/7 Service (~5kUsers) to 2 SAP Systems on SAP MM WM LE PM QM FI CO PS JVA HR BO Basis
· Provided second level support on SAP ECC6 MM, WM, LE, PM, HR (travel, timesheet, hiring process) business processes analysis, preparing Functional Specifications, validating effort estimation from L3
· Led requirement gathering, business processes mapping into SAP. Prepared Functional Specifications documents, Assisted business in the UAT, data migration onto SAP via LSMWand post go live support
· Performed bug fixing, root cause analysis, workaround identification for complex issues in all SAP Areas
· Played the role of ERP top point of escalation in case of complexity, difficulty, or criticality.
· Focal point for interacting with ENI CoE. L3 Supplier managing, controlling and evaluating performances
· Defined, negotiated, maintained and monitored Service KPI, SLA, OLA, Standards, Metrics, and Procedures
· Overseen all aspects of SAP configuration, maintenance, integration, documentation, knowledge management
· Implemented Contract Novation, Contract Close Out, and Funds Transfer functionalities, Plant Maintenance interim solution, Budget&Contracts Monitoring (MCR). Coordinated segregation of NCOC BV and AKCO SAPs
· Interfaced SAP with the company Vendor Qualification System, PoB System, RFID, SIGEP, and Primavera
· Implemented tool for creating automatically SE from Contractor’s timesheet and tracking Costs per Employee
· Controlled and reported Service and Projects. Ensured corrective actions were taken when necessary
· Worked closely relations with Stakeholders. Ran Service meetings with BPOs. Interacted with Auditors
· Received zero audit finding since 2008 on ERP&Support Service processes (audited 2 times/year by 2 Big Four)
4/2006-6/2007:
SAP MM and LE Architect for Eni Agip KCO – Milan, Italy
· SAP MM, LE Architect and Abap Factory Coordinator (9 people) the SAP E2E implementation Project
· Designed and implemented custom functionalities for Procurement Outlook, Pre-award Contract management, Local Content management and reporting to RoK Authorities. Contract amendments management
· Supervised SAP Procurement WF implementation. Coordinated the Legacy Data migration onto SAP
· Ran functional analysis, gap&fit, configuration, writing FS, testing, UAT, go-live, post go-live hypercare on site
10/2001-3/2006:
SAP Logistics Support&Delivery Lead for Eni Snam Rete Gas – Milan, Italy
· Started as project manager of the Master Data Migration project (3 months), and then became Lead Architect of MM, PM, LE, WM, and QM in the SAP R/3 implementation project and Coordinator of the Abapers of the project
· After project delivered, led a team (6 people) providing Support and Delivery Service (including Demand and Change Management) of a SAP R/3 solution in the modules MM, LE, QM (~2k SAP users)
· Delivered ~200 SAP major enhancements. Interfaced SAP with an automated warehouse system and RFID
· Initially receiving ~600 ticket/month in 2002, reduced to ~30/month in 2006 through continuous improvement
· Project Manager and SME in 4 SAP evolution projects: Pipeline Construction Life Cycle management, Pipes Delivery management, Spare Parts management, MRP customized logic, and SAP WM implementation
· SAP MM, LE, WM, PM and QM Team Lead in the SAP upgrade from SAP 4.0 to 4.7×200
11/1997-9/2001:
SAP MM Architect and Team lead at SIDI SpA – Padova, Italy
· Started as Abaper (6 months), and then became Advisor (6 months) and Team Lead in SAP MM WM PM
· Successfully Completed 5 E2E SAP R/3 implementations and 2 roll out (~70% working remotely) in the following firms within the Manufacturing/Utilityindustry: Ambach, Ascopiave, Elba, Fiamm, Mta, Parmareggio,and Simac
· Responsible for migration of Master Data from legacy systems onto SAP
· Interfaced SAP with 2 automated warehouses systems, 2 barcode readers, and 1 pen PC
· Faced several different Business Organization Models. Managed Vendor Planning, Subcontracting, Product Configuration, BOM, Batch, Deliveries, Material Lifecycle and Master Data Management
· Acquired deep knowledge in MMand interactions with other modules. Gained ample experience in analysis, gap&fit, and excellent ability on fitting compound Business Processes into SAP Standard
OTHER INFORMATION
EDUCATION
MASTER’S DEGREEIN ELECTRONIC ENGINEERING – Padova, Italy
CERTIFICATIONS
ITIL V3 foundations Certified
LANGUAGE Italian: native; English:fluen
109 total views, 1 today